VELOCITY XLCONSTRUCTION
|
|

FAST
BUILD KIT
WINGS / CANARD
Includes completed wings, winglets and canard, as well as
molded ailerons, rudders and elevators all finished through primer with Com and
Nav antennas installed.
FUSELAGE
Includes installed carbon
door beams, bulkheads and firewall, instrument panel and conduit ducts with top
and bottom fuselage halves permanently joined, glassed and finished through
primer; upper and lower cowlings removed and flanged; and doors aligned and
attached to the fuselage with internal hardware installed. Also installed are the landing gear axles,
tires, windshield and all side windows.
UPGRADES / OPTIONS
Interconnected rudder
pedals with dual toe brakes, upgraded main wheels, heavy-duty brakes and center
keel drop down controls.
|
TOTAL BUILDING TIME:
4,700+ hours / 78 months |
The building time above does
not count planning, research, ordering, task preparation, shop cleaning time,
and other associated building activities; which add numerous hours both inside
and outside the shop. After completing
the airplane, I estimate that another 20% additional time is spent on these
activities. Also, the log does not
consider any building time contributed by
friends and family members which add up to the total building time.
For the most part, the
building sequence follows the sections in the manual. Therefore, tasks grouped in a particular
section probably did not follow my actual building sequence, for which I kept a
log.