CONSTRUCTION OTHER |
|
RECENT ADDITIONS: Electrical System /
Pitot/Static System / Brake System |
FAST
BUILD KIT
WINGS
/ CANARD
Includes completed wings, winglets and canard, as well as molded
ailerons, rudders and elevators all finished through primer with Com and Nav
antennas installed.
FUSELAGE
Includes installed carbon
door beams, bulkheads and firewall, instrument panel and conduit ducts with top
and bottom fuselage halves permanently joined, glassed and finished through
primer; upper and lower cowlings removed and flanged; and doors aligned and
attached to the fuselage with internal hardware installed. Also installed are the landing gear axles,
tires, windshield and all side windows.
UPGRADES / OPTIONS
Interconnected rudder
pedals with dual toe brakes, upgraded main wheels, heavy-duty brakes and center
keel drop down controls.
|
TOTAL BUILDING TIME: Hours: 3,524 Months: 60 |
NOTE: For the most part, the building time above
does not count any planning, researching, ordering, task preparation,
shop cleaning times, and other similar
activities, which add numerous hours both inside and outside the shop. I estimate
that at least another 30% additional time is
spent on these activities. Also, the log
does not consider any building time
contributed by friends and family members which adds up to the total
building time.
Because I normally try to
work on more than one task at a time, I felt it better to organize the building
sequence per the sections in the manual, and not list them
chronologically. Therefore, tasks
grouped in a particular section may not follow my actual building sequence, for
which I keep a log.