DOORS. Spring Hard Point Installation #1

doorsspringhardpointinstallation1.jpg

The hardpoint was initially bonded to the carbon fiber beams with a small amount of five-minute epoxy. Once cured, it was packed with a cabo-flox mixture and given final shape. To avoid deforming it, I let the cabo-flox mixture partially cure before covering it with BID.

Photo album created with Web Album Generator